December 31, 2023: Parwan Gravity Dam project team has received the Certificate of appreciation from Chief Engineer - WRD Kota for achieving the 4.6 million safe man hours without Loss Time Injuries (LTI) as of 31 December 2023. The certificate is issued in recognition and appreciation of the outstanding performance of the HSE aspect, significant efforts and contribution made in providing a safe working environment. HCC in the joint venture with HSEPL is constructing concrete gravity dam and tunnel on EPC Basis. The contract is awarded by the Water Resources Department, Government of Rajasthan. The project is located approximately 375 kms from Jaipur and is part of Parwan Irrigation cum Drinking Water Supply Project on Parwan river, which is a tributary of Kalisindh river, flowing into Chambal river.