HCC awarded Bangalore Metro Rail project

July 3, 2017: Infrastructure major, Hindustan Construction Company Ltd (HCC), a lead partner in the joint venture with URC Construction Pvt Ltd., has been awarded Rs 797.29 crore contract by the Bangalore Metro Rail Corporation Ltd. HCC share in the JV is 51% (Rs 406.61 crore). The project is to be completed in 36 months. 

The contract is for the construction of 6.340Km long elevated corridor and 5 elevated stations between HSR Layout station and RV Road station. The five stations on this section are Central Silk Board, BTM Layout, Jayadeva Hospital, Ragigudda and RV Road. The contract also includes, the construction of road-cum-rail flyover, road widening and allied works. 

This is a part of the fully elevated 18.82 km R.V. Road to Bommasandra section of the Phase II of Bangalore Metro Rail Project. The total length of Phase II is 72.095 km out of which 13.79 km is underground. This phase has 6 sections with 61 Stations out of which 12 stations are underground.